For this project, ARPA was responsible as the prime contractor for the design, manufacture, delivery and installation of the Handling vacuum tube lifters, as well as of the metal supportive structures for inbound and outbound use at Ramstein Passenger Terminal.
The scope of work include but not limited to the manufacture and installation of metal supportive structures , aluminum crane jibs, 8x Vacuum Generators, 8x Lifting Units, 8x Operating Units and 8x Vacuum Grippers, for inbound and outbound sights in the airport.
This made the logistics of heavy packages easier for the our client’s stuff members.
Want to find out more about this project? Or discuss your own requirements? Contact with us and speak to one of our experts.







